| Incentive Payment |
|
|
- NYSERDA will pay 65 % of the incentive after the components are delivered on site.
- The remaining 35 % will be paid upon completion of the project
|
| Qualified Wind Generators |
- Only Qualified W ind Generators may be installed under this program
|
| Wind Towers |
|
| Wind generators m ust be m ounted on new towers that are designed to accommodate wind generators
similar to the wind generator proposed. Wind generators may not be mounted on any pre-existing structure. |
| |
| NYSERDA Requirements for Wind Turbine Locations |
- Minimum lot size of 1 acre
- Minimum distances between the tower base and human-occupied buildings of 300ft for turbines under 20KW** Waivers can be given upon request**
- Minimum setback of the tower height plus the wind turbine from any power lines or property line
- Minimum setback of 15 feet from any structures.
- The minimum annual average wind speed at hub height is 10 miles per hour considering losses due to obstacles
and other factors.
|